OEM Workflow
From RFQ to qualified mold delivery
Our process keeps engineering review, toolmaking, trial validation, and shipment expectations in one visible path so overseas buyers know what happens next at each stage.
- 01
RFQ & Drawing Review
We check part geometry, target resin, annual volume, and delivery goals before confirming the mold scope.
- 02
Engineering Review
Engineers flag wall-thickness, draft, gate, cooling, and undercut risks so we can align on the right solution early.
- 03
Mold Design
Review the proposed layout for movement clearance, ejector return and access to cooling connections.
Design review questions
- Are core, lifter and ejector movements checked for interference over their full travel?
- How is ejector return confirmed before the mold closes?
- How will the cooling connections be accessed and checked for leaks?
- 04
Mold Manufacturing
Core and cavity steel move through CNC, EDM, wire cut, drilling, and finishing under an in-house schedule.
- 05
Mold Assembly
We assemble inserts, actions, hot runner parts, cooling lines, and standard components into a trial-ready tool.
- 06
Mold Trial & Validation
T0/T1 sampling verifies filling balance, dimensions, appearance, and cycle behavior with a written action list.
- 07
Customer Approval
Trial reports, part photos, and sample feedback are closed out before shipment or production release.
- 08
Delivery
Before shipment, we confirm the packing method, documents to be supplied, and any agreed spare parts or startup guidance in your quotation.
Mold trial and handoff
Mold trial views and handoff checklist
The trial clip and exterior photo show the same mold. Use the checklist below to agree the records needed for your project.
In this silent clip, the mold opens and closes, with light-colored samples visible.

The same mold shown separately, with its exterior and interfaces visible for discussion.
| Record | What to confirm for your project |
|---|---|
| Tool and drawing revision | Which mold ID and controlled part and mold revisions the records cover. |
| Trial machine, resin, and conditions | Which trial date, machine configuration, resin grade, and molding settings the sample record should identify. |
| Sample checks and open corrections | Agree what each sample set must verify: dimensions and tolerances, fit, function (such as sealing), or appearance. Link the checked sample IDs, resin and revision to results, approval scope and the agreed next stage; track open corrections by issue ID, owner, retest evidence and approval status. |
| Shipment package | Agree the file index and revisions, spare-part IDs and quantities, and whether each item is included in the quotation or separately quoted. |
| Receiving-site checks | Agree arrival checks for mold identity and revision, transport condition, interfaces and installation, and who is responsible. For repairs or replacements, identify the affected component and revision, then agree sample checks, conditions and responsibility for re-verification against the approved part requirements. |
Preview a sample DFM review, or prepare product-specific inputs with thepipe fitting RFQ guide orpackaging mold RFQ guide.
Ready to start?
Get engineering review before tooling begins.
Send your files or project brief and we will review manufacturability, likely risk points, and the recommended mold approach.